Food & beverage · 14 June 2025 · 2 min read
Linear programming in the hotel bakery
🏨 HOTEL MANAGERS: Stop leaving money on the table! Linear Programming can revolutionize your resource allocation and boost profits by 15-25%. Here’s how using a simple bakery example 🧁
THE REAL CHALLENGE:
Your hotel bakery produces 2 cakes with limited resources:
• Chocolate Cake: $15 profit each (requires 3 cups flour, 2hrs baker time, 1hr oven)
• Vanilla Cake: $12 profit each (requires 2 cups flour, 1.5hrs baker time, 0.8hrs oven)
DAILY CONSTRAINTS:
• 60 cups flour available
• 30 hours baker time maximum
• 16 hours oven capacity
• Must produce at least 1 of each type (customer variety expectation)
THE LINEAR PROGRAMMING FORMULA:
🎯 OBJECTIVE: Maximize 15X + 12Y
(Where X = chocolate cakes, Y = vanilla cakes)
📊 CONSTRAINTS THAT LIMIT YOU:
• Flour limitation: 3X + 2Y ≤ 60
• Baker capacity: 2X + 1.5Y ≤ 30
• Oven capacity: 1X + 0.8Y ≤ 16
• Minimum variety: X ≥ 1, Y ≥ 1
STEP-BY-STEP SOLUTION:
We test corner point solutions (where constraints intersect):
• Option 1 (1,1): Profit = $27
• Option 2 (1,18): Profit = $231 ✅ OPTIMAL
• Option 3 (14,1): Profit = $222
SURPRISING RESULT: 1 chocolate + 18 vanilla = $231 maximum daily profit
COUNTERINTUITIVE INSIGHT:
Even though chocolate generates higher profit per unit ($15 vs $12), producing mostly vanilla cakes maximizes total profit! Why? Vanilla uses fewer resources per cake, allowing higher volume production within your constraints.
EXCEL IMPLEMENTATION (5 SIMPLE STEPS):
1. Data → Solver (install add-in if needed)
1. Set Objective: Total profit cell (select “Max”)
1. Variable Cells: Number of each cake type
1. Add Constraints: Resource limits + minimum production rules
1. Choose “Simplex LP” method → Solve
IMMEDIATE HOTEL APPLICATIONS:
🏨 Room Mix Optimization: Standard vs suite allocation based on housekeeping capacity
👥 Staff Scheduling: Full-time vs part-time ratios within budget constraints
🍽️ Menu Engineering: High-margin vs quick-prep dishes given kitchen limitations
🛏️ Housekeeping Routes: Maximize rooms cleaned within time constraints
💰 Revenue Management: Rate strategies considering demand and capacity limits
🚗 Parking Allocation: Guest vs valet spaces for maximum revenue
RESOURCE UTILIZATION ANALYSIS:
With optimal solution (1 chocolate, 18 vanilla):
• Flour usage: 39/60 cups (65% - room for growth)
• Baker time: 29/30 hours (97% - bottleneck identified!)
• Oven time: 15.4/16 hours (96% - near capacity)
This analysis reveals your baker time is the constraint limiting further profit growth - focus improvement efforts here!
KEY BUSINESS TAKEAWAY:
Linear Programming reveals non-obvious solutions. Your intuition might say “focus on high-profit items,” but math shows resource efficiency often trumps unit profitability. The “lower profit” option frequently maximizes total returns when resources are scarce.